Zero Energy Certified

CAMPBELL COLLECTIVE

VITAL STATS

Certification StatusZero Energy Certified
Version1.0
LocationLos Angeles, CA, USA
TypologyExisting Building
Gross Building Area948 SF
Start of OccupancyJuly 2020
Occupancy TypeResidential Building
Number of Occupants2

PROJECT TEAM

OwnerRyan McEvoy
General ContractorBuilding Doctors
MEP EngineerBuilding Doctors
Water ConsultantsGaia Water Solutions
Permaculture ConsultantGaia
LandscapeGaia
Certification ConsultantGaia
Solar InstallerLongman Lindsey
Additional ConsultantBio Habitats

RENEWABLE PRODUCTION SYSTEMS INFORMATION

ENERGY PERFORMANCE

Renewable TypeSolar Electric (PV)
Total Renewable Capacity7.7 kW
Renewable LocationOn-site
Photo Courtesy of Gaia Development

PROJECT LEADERSHIP AND STORY OF THE PROJECT

The Campbell Collective project is a single-family house built in 1947 in the Ballona Creek Watershed of Los Angeles. Upon purchase eight years ago, the 948-square-foot property on barren terrain was composed of degraded soil with no biology, low-quality patchy grass, and no native plants.

With a permaculture approach, owner Ryan McEvoy and his partner Kat implemented compost areas, edible trees, mulching-in-place for ground protection, and raised garden beds for healthy soil creation. The project has increased ecological complexity and resiliency with support from a passionate crew who maintains the chicken flock, nursery, and beekeeping.

The addition of solar panels and a closed-loop water system helped the project achieve net-positive water and energy. Today, twenty organic, mature fruit trees welcome passersby from the sidewalk. The backyard farm offers tenants and friends abundant food year-round. As engaged community members, the owners swap their harvest at the weekly farmer’s market for different vegetables and fruit. The Campbell Collective has become a venue for hosting events and workshops to empower sustainability education, skill growth, and neighborhood connection.

The owner of the Campbell Collective was very strategic about energy efficiency, with 20 years of experience, knowledge, and wisdom gained as a high-performance building consultant. He took on the Living Building Challenge with an existing residential home originally built in 1947 to reduce embodied carbon because the most sustainable building is the one that is already built.

Photo Courtesy of Gaia Development

DESIGN PROCESS

From indoors to outdoors, you will see materials creatively salvaged and reclaimed to further reduce carbon emissions. For example, used fishing nets were re-purposed into yard fences for plants to grow along, office desks were re-cut into tables, and an old boat was turned into a raised garden bed. The conservation ethos created an immersive environment for tenants to learn and adopt sustainability practices.

Solar was installed to produce renewable energy onsite which also offset the embodied carbon added to the project for insulation. The project set out for a target EUI for net-positive energy. Photovoltaic panels on the house and garage roofs provide more than enough solar energy for the residents, producing more energy than is consumed annually. The REC’s are owned and held by the owner to ensure that they would not be sold at any point during the lifespan of the Campbell Collective.

The Campbell Collective applied several strategies to obtain 30% net-positive energy. Design features to reduce home energy loads include PV, insulation in the walls, attic, and under the floor, shaded trees, roof overhangs, and heat pump HVAC.

Tenants engaged in energy conservation efforts in many ways. They were encouraged to use windows for natural ventilation, never raise the temperature above 100 F and not below 40 F, monitor energy usage with smart meters, and use smart plugs to turn off devices in entire rooms when not in use.

The data collected showed on-site energy storage could maintain critical loads for one week in the case of an emergency. The home’s resiliency plan includes a portable freezer that is charged with a portable power station/batteries, which are powered by solar energy.

The project is located in Southern California, with favorable weather for maximizing energy efficiency and survivability.

chevron_left