Certified Case Studies
-
SUPERIOR ESSEX 10GAIN XP CAT 6A LSHF
Superior Essex International LP
Imperative Certified
Superior Essex International LP is an industry leader in the manufacture of optical fiber and copper communications cable products and accessories used to interconnect enterprises, campuses, and communities worldwide. Product lines include Premises and Outside Plant (OSP) copper and fiber data cables, Wireless and Distributed Antenna Systems (DAS) coaxial cables and accessories, and Fire Alarm…
-
ADLAI STEVENSON HIGH SCHOOL EAST ADDITION
Lincolnshire, IL, USA
Zero Energy Certified
LBC 3.1
VITAL STATS PROJECT TEAM BUILDING SYSTEMS INFORMATION MECHANICAL SYSTEM DESCRIPTION A dedicated Outside Air Unit provides outside air ventilation, as required by code. It provides room neutral temperature to allow the efficient VRF system to modulate space temperature. VENTILATION SYSTEMS The dedicated Outside Air Unit provides code required outside air ventilation. The energy recovery wheel…
Building
-
ARCC EAST COUNTY BRANCH OFFICE AND ARCHIVES
Santee, CA, USA
Zero Energy Certified
LBC 3.1
The ARCC East County Branch Office and Archives serve the County of San Diego Assessor, Recorder, and County Clerk. The facility is an office building of approximately 25,000 sf including a 15,100 sf ARCC branch office and a 9,900 sf archival storage facility. It is the first Net Zero Energy archive facility in the United…
Building
-
ARCHIMANIA’S OFFICE
Memphis, TN, USA
Zero Carbon Certified
LBC 3.1
VITAL STATS PROJECT TEAM BUILDING SYSTEMS INFORMATION MECHANICAL HEATING AND COOLING The archimania office building consists of two geothermal variable speed fan and variable speed compressor heat pumps. One heat pumps serves the open office seating area and operates in a single zone variable air volume (VAV) configuration. The second heat pumps serves office and…
Building
-
CREEKSIDE COMMUNITY HIGH SCHOOL
Tigard, OR, USA
Zero Energy Certified
LBC 3.1
Creekside Community High School is a 17,830 sf building located in Tigard, OR, which is a suburb of Portland. The building operates on a typical high school schedule with mostly full occupancy from approximately 8am-5pm from September 14th to June 16th, and reduced usage in the summer months. The building also has very limited use…
Building
-
COSD – BORREGO SPRINGS LIBRARY
Borrego Springs, CA, USA
Zero Energy Certified
LBC 3.1
VITAL STATS PROJECT TEAM RENEWABLE PRODUCTION SYSTEMS INFORMATION PV inverter onsite with 103.95 kW of renewable capacity. ENERGY PERFORMANCE & EUI
Building
-
ELECTRICAL TRAINING INSTITUTE – ZERO NET ENERGY CENTER
Commerce, CA, USA
Zero Energy Certified
LBC 3.1
The Electrical Training Institute (ETI) of Southern California is an education and training facility for electrical contractors run by the National Electrical Contractors Association (NECA) Los Angeles County Chapter and the International Brotherhood of Electrical Workers (IBEW) Local 11. Project scope of a full retrofit the existing 150,000 sq. ft. building to net zero energy…
Renovation
-
FIVE ELEMENTS HARVEST HOUSE
Custer, WA, USA
Zero Energy Certified
LBC 3.1
VITAL STATS PROJECT TEAM BUILDING SYSTEMS INFORMATION NON-MECHANICAL SYSTEMS Active/Passive thermal masses and integrated stack effect: South facing solarium with 10-inch black slab and 8-inch concrete wall to basement intakes heat during daylight, which is refused by exterior doors to basement/main house or accepted via these doors to heat basement/main floor and to convey heat…
Building
-
MINNEAPOLIS NET ZERO VICTORIAN
Minneapolis, MN
Zero Energy Certified
LBC 3.1
VITAL STATS Certification Status Zero Energy Certified Date of Certification December 11, 2017 Version of LBC 3.1 Location Minneapolis, MN, USA Typology Building Project Area 3,640 SF Start of Occupancy October 2016 Owner Occupied Yes Occupancy Type Single Family Residence Number of Occupants 2 PROJECT TEAM Owner Stewart + Linda Herman Project Manager Marc Sloot…
Building
-
NORTH COASTAL LIVE WELL HEALTH CENTER
Oceanside, CA
Zero Energy Certified
VITAL STATS Certification Status Zero Energy Certified Location Oceanside, CA, USA Typology Building Gross Building Area 54,560 SF Start of Occupancy August 2018 Occupancy Type Government Office & Live Well Regional Center Number of Regular Occupants 50 PROJECT TEAM Owner County of San Diego Project Manager County of San Diego Architect HMC Architects Contractor Balfour…
Building