Certified Case Studies

  • BULLITT CENTER

    SEATTLE, WA


    SEATTLE, WA The Bullitt Center is a six-story commercial office building in the Central Area of Seattle, WA. The Center is home to a number of commercial office tenants who are successfully operating their businesses, while working in a net-positive energy environment. The Bullitt Center aims to advance the awareness and adoption of high-performance building…


    Building

  • EDITH GREEN WENDALL WYATT FEDERAL BUILDING

    OMAHA, NEBRASKA


    PORTLAND, OR The General Services Adminstration’s Edith Green Wendell Wyatt Federal Building is an 18 story regional office in Portland, Oregon with 16 federal agencies and a visible PV array on the downtown high rise.


    Building

  • VESTAS AMERICA HQ

    Portland, OR


    PORTLAND, OR The Vestas America Headquarters is a state of the art high performing office, heading up operations for one of the world’s largest Wind manufacturing companies.


    Building

  • HAYES FREEDOM HIGH SCHOOL

    CAMAS, WA


    CAMAS, WA


    Building

  • ARCH|NEXUS SAC

    SACRAMENTO, CA


    SACRAMENTO, CA Arch|Nexus SAC is an adaptive reuse of an existing 8,252 SF one-story structure located at 930 R Street in Sacramento, California from warehouse office to professional office for Architectural Nexus, Inc., an architectural firm with an integrated practice (planning, landscape architecture, interior design) reaching throughout the western United States and beyond.


    Building

  • 4940 BUILDING

    OMAHA, NEBRASKA


    OMAHA, NEBRASKA Morrissey Engineering Inc’s 4940 Building was the first building in Nebraska to be awarded LEED Platinum certification, the highest level of certification achievable. The project site, in a suburban area, is located in the Roanoke Business Park, a compact development with shared public spaces and close proximity to many current and future planned…


    Building

  • OREGON EPISCOPAL SCHOOL

    PORTLAND, OREGON


    PORTLAND, OREGON Oregon Episcopal School is an independent PK-12 school located in Southwest Portland. The Lower School building serves about 350 children in grades PK through 5. Having an aggressive low energy consumption target fits well in our school that features an inquiry-based approach to education, where the building itself provides an important learning tool. The…


    Building

  • FOLEY COURTHOUSE

    SPOKANE, WASHINGTON


    SPOKANE, WASHINGTON Built in 1967 and retrofit in2013, the Thomas S. Foley U.S. Federal Courthouse in Spokane, WA, is a 10-story, 272,000 sq. ft. building that includes courtrooms, offices, and a maximum-security cell detention block. The U.S. General Services Administration (GSA) hired a joint venture comprised of McKinstry and Lydig Construction to modernize the courthouse…


    Building

  • SIERR

    SPOKANE, WASHINGTON


    SPOKANE, WASHINGTON The Spokane & Inland Empire Railroad (SIERR) Building, built in 1907,was formerly a repair depot for the city’s first electric railway system. The very neglected, partially collapsed building (which had been hit by a train) was converted by McKinstry to be its regional Inland Northwest headquarters (occupying 30,000 sq. ft. of the 68,000…


    Building

  • WSU EVERETT

    EVERETT, WASHINGTON


    EVERETT, WASHINGTON This building is the home of Washington State University –Everett, which includes Mechanical, Electrical, and Software Engineering, Data Analytics, Hospitality Business Management, and Integrated Strategic Communication Programs. The project was awarded as through a design competition and sought funding through a state grant which required that the design use 50% less energy compared…


    Building