MINNEAPOLIS NET ZERO VICTORIAN

VITAL STATS Certification Status Zero Energy Certified Date of Certification December 11, 2017 Version of LBC 3.1 Location Minneapolis, MN, USA Typology Building Project Area 3,640 SF Start of Occupancy October 2016 Owner Occupied Yes Occupancy Type Single Family Residence Number of Occupants 2 PROJECT TEAM Owner Stewart + Linda Herman Project Manager Marc Sloot […]

OHM SWEET OHM

VITAL STATS Certification Status Zero Energy Certified Date of Certification November 30, 2017 Version of LBC 3.1 Location Roseville, MN, USA Typology Building Project Area 2,434 SF Start of Occupancy September 2016 Owner Occupied Yes Occupancy Type Single-Family Residence Number of Occupants 2 PROJECT TEAM Owner Mark + Kate Hanson Project Manager Marc Sloot General […]

HONDA SMART HOME US

VITAL STATS PROJECT TEAM BUILDING SYSTEMS INFORMATION NON-MECHANICAL SYSTEMS The passive design strategy optimized the orientation of fenestration for daylighting (north clerestory windows) as well as the southern windows’ overhangs; note that the roof overhang is optimized for 2F windows, as well as the additional awnings applied over the lower windows on the South side. […]

LINCOLN NET POSITIVE FARMHOUSE

VITAL STATS PROJECT STORY AND LEADERSHIP This modern farmhouse blends into the cultural landscape of Lincoln, Massachusetts – a town known for its rich history, farming traditions, conservation efforts, and visionary architecture. The President of Thoughtforms, an accomplished builder in the greater Boston area, and his wife collaborated with ZED to design and build a new […]

ALPINE BRANCH LIBRARY

vital stats project team building systems information MECHANICAL HEATING AND COOLING VRF systems utilize Heat Recovery Ventilation, allowing zones to heat while others cool. It utilizes refrigerant running between the fan coils and the Heat Recovery Unit to transfer heat from the warmer zones to the cooler zones if needed. MECHANICAL VENTILATION The system utilizes a […]

MAHLUM PORTLAND OFFICE

VITAL STATS PROJECT TEAM PLACE PETAL 01. LIMITS TO GROWTH Mahlum’s previous Portland location was in a multi-story unreinforced masonry building with inequitable workspace locations. One of the most important reasons for the office move was to ensure employee health (daylighting/indoor air quality) & resiliency (seismic event). The team selected an existing single story timber […]

INDIGO | HAMMOND + PLAYLE ARCHITECTS STUDIO AND OFFICE

vital stats Project team building systems information non-mechanical systems The buildings are laid out so that virtually all the windows face either south or north. The south-facing windows are designed with overhangs that will shade the windows in the summer yet admit sunlight in the winter which will be used to heat the building. Thermal […]

LAKELINE LEARNING CENTER

vital stats project team PROJECT LEADERSHIP AND STORY OF PROJECT The Lakeline Learning Center set a new precedent for Foundation Communities, as a model for outstanding design, collaboration, and innovation. Foundation Communities’ mission is to provide housing where families can succeed. There is a clear alignment between this mission and sustainable buildings. – Energy and […]

CAMP GLENORCHY – ECO RETREAT

vital stats project team place petal 01. LIMITS TO GROWTH IMPERATIVE Prior to the development of the Campground, the site was essentially an undeveloped flat paddock with two existing residences to the northeastern and southwestern corners. Existing planting on the site consisted of an assortment of exotic shrubs around the western house with a Photinia […]

WILDE LAKE MIDDLE SCHOOL

VITAL STATS Certification Status Zero Energy Certified Location Columbia, MD, USA Typology Building Project Area 106,622 SF Owner Occupied Yes Occupancy Type Educational Number of Occupants 800 PROJECT TEAM Owner Howard County Public School System Project Manager Howard County Public School System General Contractor Oak Contracting, LLC Architect TCA Architects, LLC MEP Engineer James Posey […]

« Previous PageNext Page »